Airlogic ABM-400 Manual do Utilizador Página 34

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 148
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 33
- 34 -
Conclusion
As mentioned previously, the example above is only an example. The Tinker analysis will
include more alternatives as well as when and how to implement each AIT. Furthermore, this
analysis did not take into account an accurate amount of time needed at each process step. A time
study will need to be conducted to determine the time it takes to uniquely identify assets at each
touch point. The touch points will be determined after analyzing a process mapping of an asset
upon entrance to departure from the facility. Last, not all of these benefits or savings may be
applied to Tinker and it may be the case that some benefits and savings should be added.
Benefits and savings depend on the process mapping.
Vista de página 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 147 148

Comentários a estes Manuais

Sem comentários